Sunday, March 17, 2013

LD 72 -- A Bill to Save the St. Croix River

Native alewives coming home to the Kennebec River, Waterville, Maine.
Underwater photo by Tim Watts at Ticonic Falls, June 2003.


Native alewives are like bluebirds, robins, cardinals, chickadees and brook trout. They are the warp in the woof of life in coastal New England. They are the bright, shiny hopeful harbingers of spring. To young children, the story of their migration is as fascinating as the sheer fun of scooping them up with tiny, water-chilled hands as new leaves unfold in April. Alewives are wild local nature in the flesh, the creators of childhood memories which once impressed cannot be worn away by time.

Like all of Maine's large rivers, the St. Croix River lost its enormous runs of alewife, salmon and shad due to the building of dams without fishways in the early 1800s -- even though the laws at the time required them. 

In the 1960s, the St. Croix started to get its native fish back when the U.S. and Canadian governments paid for new fishways at the river's major dams. By the late 1980s the native alewife run on the St. Croix had grown to 3 million strong --  the largest alewife run in North America --  stunning proof of how cleaning up water pollution and making dams passable to native fish can quickly restore ecosystems once given up as gone. 

But in the late 1980s a small group of fishermen on Spednic Lake on the St. Croix decided a recent downturn in smallmouth bass fishing was wholly caused by native alewives. Although they had no evidence, except the obvious fact that there were native alewives in the lake, these anglers pressed their case to their local legislators. In 1995 these legislators pushed through a state law requiring native alewives not be allowed to use the federally funded fishways built on the St. Croix specifically for them. By 2002 the river's alewife run had fallen from 3 million fish to only 800.

In 2001 the Maine Legislature debated but refused to remove the state's 'alewife ban' on the St. Croix.  In desperation, the Canadian government began trucking the river's few remaining alewives over the Woodland dam, whose blocked fishway is on the U.S. side of the river. This Canadian action saved the St. Croix's alewife run from total extinction.  In 2008 the Maine Legislature allowed alewife passage at the Woodland dam, but this feeble measure has left 98 percent of the fishes' habitat inaccessible and kept the population stuck at a meager 20,000. 

Native alewives have been extinct from Spednic Lake for more than 20 years and the smallmouth bass fishing at Spednic Lake today is no better or worse than it was when the whole hubbub started. This is object proof that native alewives had nothing to do with the quality of smallmouth bass fishing at Spednic in the first place. 

Since the late 1980s a mountain of scientific studies have been conducted on the St. Croix and elsewhere in Maine which conclusively show native alewives have no ill effect on smallmouth bass or any other fish. But the 1995 law which started it all is still on the books and is still being enforced each spring by Maine's fisheries commissioners. In 2013, alewives still cannot reach 98 percent of their native habitat in the St. Croix. This spring, like every spring since 1995, the St. Croix's native alewives will return from the Atlantic Ocean to the Grand Falls Dam and find a locked and bolted door between themselves and the natural lakes where they have spawned since the last Ice Age.

State Rep. and Passamaquoddy Tribal Representative Madonna Soctomah and other concerned legislators have sponsored an emergency bill to finally repeal the 1995 alewife ban law on the St. Croix and bring these native fish back to their rightful place in Maine's fourth largest river system. While the past cannot be unwritten, the future has yet to be drafted. Let's hope LD 72 is enacted and becomes the first of many new and hopeful chapters for the St. Croix and its native fish.

The bill's public hearing will be held on Monday, March 25th at 9 a.m. in Room 206 of the Cross Building at the State House Complex in Augusta. While the past cannot be unwritten, the future has yet to be drafted. Let LD 72 be the first of a new and hopeful chapter on the St. Croix. The full text of the bill is below:
--------------
LD 72 -- 126th Maine Legislature
An Act To Open the St. Croix River to River Herring

Emergency preamble. Whereas, acts and resolves of the Legislature do not become effective until 90 days after adjournment unless enacted as emergencies; and
Whereas,  river herring were once abundant in the St. Croix watershed and play a vital ecological role in that watershed and the near-shore marine ecosystem; and
Whereas,  the decline in the river herring population in the St. Croix watershed affects the ecological and economic health of that watershed and the near-shore marine ecosystem; and
Whereas,  the prohibition on allowing river herring to pass upstream from the Grand Falls Dam on the St. Croix River is a significant impediment to the restoration of river herring to historic levels in the St. Croix watershed; and
Whereas,  legislation allowing unimpeded passage of river herring upstream from the Grand Falls Dam on the St. Croix River needs to take effect prior to the river herring's spring spawning run; and
Whereas,  in the judgment of the Legislature, these facts create an emergency within the meaning of the Constitution of Maine and require the following legislation as immediately necessary for the preservation of the public peace, health and safety; now, therefore,

Be it enacted by the People of the State of Maine as follows:
Sec. 1. 12 MRSA §6134, as amended by PL 2011, c. 598, §12, is repealed and the following enacted in its place:

§ 6134. River herring passage; fishways on the St. Croix River
By May 1, 2013, the commissioner and the Commissioner of Inland Fisheries and Wildlife shall ensure that the fishways on the Woodland Dam and the Grand Falls Dam located on the St. Croix River are configured or operated in a manner that allows the unconstrained passage of river herring.
Emergency clause.  In view of the emergency cited in the preamble, this legislation takes effect when approved.

SUMMARY
This bill provides that, by May 1, 2013, the Commissioner of Marine Resources and the Commissioner of Inland Fisheries and Wildlife must ensure the fishways on the Woodland Dam and the Grand Falls Dam located on the St. Croix River are configured or operated in a manner that allows the unconstrained passage of river herring.

Sponsored By: Representative SOCTOMAH of the Passamaquoddy Tribe; Cosponsored By: Representative AYOTTE of Caswell, Representative BEAR of the Houlton Band of Maliseet Indians, Representative BEAUDOIN of Biddeford, Representative BERRY of Bowdoinham, Representative DOAK of Columbia Falls, Senator DUTREMBLE of York, Senator JACKSON of Aroostook, Representative MITCHELL of the Penobscot Nation, Representative PARRY of Arundel. 

----------


Saturday, March 16, 2013

LD 931 -- Bad for Sebago Lake


Representative Michael Shaw of Standish has presented another bill before the Legislature which attempts to legally mandate unnaturally high water levels at Sebago Lake. This is one is titled LD 931. No public hearing has been scheduled but it will be certainly up for public hearing within the next several weeks. The bill states in full:

---------

126th MAINE LEGISLATURE
FIRST REGULAR SESSION-2013
Legislative Document  No. 931
House of Representatives, March 7, 2013

An Act To Prevent Fish Kills and To Allow for Recreational Use of Sebago Lake

Presented by Representative SHAW of Standish. Cosponsored by Senator PLUMMER of Cumberland and Representatives: KINNEY of Limington, MAREAN of Hollis, McCLELLAN of Raymond, POWERS of Naples, TYLER of Windham, VOLK of Scarborough, Senators: HAMPER of Oxford, KATZ of Kennebec.

Be it enacted by the People of the State of Maine as follows:

Sec. 1. 12 MRSA §12760, sub-§10 is enacted to read:

10. Certain lakes, rivers and streams; flow prescribed. Notwithstanding any other provision of law to the contrary, the owners, lessors, operators or other persons in control of a dam on an outlet of Sebago Lake that controls the level of Sebago Lake and the flows entering the Presumpscot River shall maintain an instantaneous minimum water flow of 250 cubic feet per second through the passageway whenever the water levels of Sebago Lake fall to or below 265 feet mean sea level on or between May 15th and  August 1st annually, or 264 feet mean sea level on or between August 2nd and November 1st annually, in order to prevent fish kills and allow for recreational use of public access to Sebago Lake. When the 250 cubic feet per second instantaneous minimum water flow rate is implemented under this section, the owners, lessors, operators or other persons in control of a dam on the outlet of Sebago Lake shall divert an instantaneous minimum water flow of 100 cubic feet per second into any existing bypass to allow the upstream passage of salmon and other resident species from the Presumpscot River.

A. A person who violates this subsection commits a civil violation for which a fine of not less than $500 or more than $1,000 may be adjudged.
B. A person who violates this subsection after having been adjudicated as having committed 3 or more civil violations under this Part within the previous 5-year periodcommits a Class E crime.

SUMMARY

This bill establishes water flow requirements for a dam and bypass area that controls the water level of Sebago Lake and the flows entering the Presumpscot River to prevent fish kills and to allow for recreational use of public access to Sebago Lake.

-----------

What is wrong with this bill? Let's start with the law the bill would amend -- 12 MRS §12760 -- which is the state's fishway law. Since the bill is all about water levels and has nothing to do with fishways, it's not even in the correct section of statute. There's a reason for this.

The Eel Weir Dam is a federally licensed dam, regulated by the Federal Energy Regulatory Commission. The Federal Power Act prohibits States from directly regulating the operations of federally licensed hydropower dams. The State must intervene, just like citizens, in the federal dam re-licensing process and submit comments and evidence, etc. 

The one legal avenue by which the State of Maine can directly regulate the operation of Eel Weir Dam is through state water quality certification (WQC) under the U.S. Clean Water Act. Maine issued its water quality certification for the dam on August 30, 2011. Even if the Legislature enacted LD 931 and the Governor signed it, the law would be void ab initio, which means 'invalid from the outset.' This is due to the way the U.S. Congress has since the 1920s limited the states' authority to regulate federally licensed dams under the Federal Power Act. 

I believe Rep. Shaw knows this -- and his actual intention in presenting LD 931 is to try and send a message to FERC showing that the majority of Sebago Lake users want a new license at the Eel Weir Dam which keeps water levels at 265 msl or higher all summer. I think he already knows the bill has a scant chance of enactment, but sees it as a useful political tool to convince FERC to issue a license keeping the lake has high as possible. 

Having LD 931 voted unanimously Ought Not To Pass by the Legislature's Fish & Wildlife Committee would send a clear message to FERC opposite that which Rep. Shaw intends. For that reason alone it is important for Sebago Lake supporters to contact your legislators on this bill and tell them you oppose it, especially if one of your legislators is on the list of sponsors and co-sponsors above.

Saccarappa Dam to Be Removed?


Dam at Lower Saccarappa Falls, Presumpscot River, Westbrook, Maine, c. 1900.
 Note the woven piles of sticks and brush in the foreground. It looks like a fish weir.


















In the first week of March 2013 the SAPPI corporation in Westbrook announced with the City of Westbrook a plan to 'explore' removing the Saccarappa Dam in downtown Westbrook on the Presumpscot River. Under their federal license SAPPI must have fishways built and in operation at the dam by 2015. Apparently SAPPI is having second thoughts about making this multi-million dollar investment at a dam which generates very little hydroelectric power. 

But it's important to remember how things got to where they are now, how they almost didn't and the crucial role played by Friends of Sebago Lake. In July 2007, the State and SAPPI and Friends of the Presumpscot River announced a secretly negotiated settlement agreement where SAPPI would remove the Cumberland Mills dam underneath the S.D. Warren mill by 2011 instead of building fishways on it. This agreement was called the Presumpscot River Settlement Framework, or PRSF for short. 

In exchange for removing Cumberland Mills dam, the PRSF would have allowed most of the fishway requirements at SAPPI's four upstream dams to be delayed for decades, and at the Dundee Dam, to be erased. No fishway would be required at Saccarappa until 2016. No fishway would be required at Mallison Falls until 2026 at the earlest, at Little Falls until 2031 and at Gambo until 2036. Because of FOSL's publicity and legal actions, the PSRF ran out of steam in 2008. In 2009 the State issued an order under the state's fishway law which required SAPPI to build fishways at the Cumberland Mills Dam by 2012. The fishways were completed this past summer, on schedule. This spring will mark the first time in 130 years that children in downtown Westbrook will be able to see sea-run fish swim up the Presumpscot River to downtown Westbrook and to Saccarappa Falls. 

This spring will be a historic and momentous occasion in Westbrook and this opportunity was very nearly lost in 2008 except for FOSL's aggressive public and legal defense. Small groups of people, when well informed and active, can make a difference. But what happens next is very unclear. 

SAPPI's federal dam license requires them to build fish passage at Saccarappa within two years of fish passage being available at Cumberland Mills dam, which was completed this past summer. This means SAPPI must have Saccarappa passable to fish by May 1, 2015. This is why SAPPI and the City of Westbrook announced on March 6 they wish to study removing the dam rather than keeping it and installing fishways. To begin this process, according to newspaper reports, the City is applying for a $733,000 federal grant to study removing the Saccarappa Dam. This seems like an awful lot of money to study removing the dam and it is quite sketchy whether Westbrook will even be awarded the grant. 

Already, attorney Sean Mahoney of the Conservation Law Foundation, who was a key river advocate in the state fishway proceeding at Cumberland Mills, has expressed concern that without more details, the City of Westbrook's proposal to study removing the Saccarappa dam could be used as a backdoor to delay building fish passage at Saccarappa for years. "My real concern is that this announcement ... looks to be preparing the ground for additional delay," Mahoney said to the Portland Press-Herald on the day of the City and SAPPI's announcement. 

Obviously, removal of the Saccarappa Dam would be the best option for the Presumpscot River's sea-run fish and expanded public use of the Presumpscot River. No fishway, no matter how well intended or well designed is close to 100 percent effective. The quirky, 200-year-old shape of the Saccarappa Dam makes successful mechanical fish passage distinctly challenging. Most likely two separate fishways would be needed, one in the dam's power canal and the other at the falls themselves. 

FERC records show that SAPPI has yet to submit any design plans for fishways at Saccarappa. By the dam's federal license requirements, fishway needs to completed by next summer (2014) in order to meet the legal deadline of actually passing fish at the dam by May 1, 2015. So from a pure pouring-of-concrete perspective, the window of opportunity for meeting this 2015 legal deadline is closing fast. So far, SAPPI has yet to produce any substantive design plans for fishways or removing the dam. The design plans for either option, in fairly complete form, need to be submitted this spring if SAPPI has any realistic hope of complying with the legal requirement for having Saccarappa passable to fish by May 1, 2015. This is the exact concern raised by Sean Mahoney of CLF in the Portland Press-Herald: that this 'trial balloon' about dam removal should not be allowed to devolve into a backdoor way for SAPPI to avoid complying with the letter of their state and federal license requirements for many years after the legal deadlines have passed.

So while the concept of removing Saccarappa looks great on paper, right now there is precious little actual paper to judge it. All that exists is a brief public announcement on March 6 by SAPPI and the City of Westbrook as reported in the local newspapers. For legal deadlines to have meaning, they must be taken seriously. The only knowns in this equation is that SAPPI's federal and state licenses require the dam to be passable to fish by May 1, 2015,  the dam is not currently passable and SAPPI has no plan on the table to make it passable by May 1, 2015.

This is why the City of Westbrook and SAPPI's stated interest in seeking a $733,000 federal grant to study the concept of dam removal is a bit disconcerting at this late date. Not that a study is a bad idea -- it's more a matter of the time necessary to do a study (also the $733,000 must be a typo -- that amount is well in the range of the cost of removing the dam). The addition of a lengthy study would seem to make it very hard for SAPPI to meet their legal deadline for making the Saccarappa Dam passable to fish by May 1, 2015. So this March 6th announcement kind of sort of sounds like a tacit admission that SAPPI is going to miss their May 1, 2015 legal deadline by a wide margin.

So as you can see, the SAPPI/City of Westbrook announcement of March 6th, 2013 raises more questions than it answers. 

Tuesday, December 6, 2011

When kids used to go down to the Kennebec River to get Atlantic salmon for breakfast.


Citation: Boardman, Samuel L.: in Ninth Annual Report of the Secretary of the Maine Board of Agriculture. 1864. Augusta, Maine. Stevens & Sayward, Printers to the State. Subsequently published in the Maine Farmer, March 23, 1865.

At page 109:

"An aged woman, who formerly lived on the banks of the Kennebec in Vassalboro, and who, at that time, had a large family of children to support, once told me that, in spring and early summer, the fish from the river were a very essential aid to them -- that many times she has sent one of her boys down to the river early in the morning to catch a salmon for breakfast, with as much certainty that he would bring one home in season, as if she had sent him with the money to a city fish market, where she knew they were kept for sale."

How Maine's Sea-Run Fish were Overfished to Oblivion

A few early to mid 1800s historic references I just came across illustrate how early and quickly the sea-run fish of Maine rivers were wiped out by over-fishing:

Citation: William Durkee Williamson. 1832. The History of the State of Maine. Vol. 1. Glazer, Masters & Co. Hallowell, Maine.

At p. 158, describing striped bass:

"The Bass is a large scale fish, variable in its size from 10 to 60 pounds. They are striped with black, have bright scales and horned backs, and are caught about the coasts. They ascend into the fresh water to cast their spawn, in May or June, being lean afterwards and fat in the autumn. In June 1807, there were taken at the mouth of the Kenduskeag, 7,000 of these fishes, which were of a large size -- a shoal, either pursued up the river by sharks, or ascended in prospect of their prey, or to cast their spawn."

Smelt at p. 160:

"They are caught in abundance, after March, in our rivers; 20 barrels of them have been taken at the mouth of the Kenduskeag at a sweep, and sometimes they are worth no more than half a dollar a bushel."

At footnote 3, same page: "On the 2d of May, 1794, at the mouth of the Kenduskeag (on the Penobscot) were taken at one draft 1,000 shad and 30 barrels of alewives."

----

Citation: Boardman, Samuel L. 'Aquaeculture': in Ninth Annual Report of the Secretary of the Maine Board of Agriculture. 1864. Augusta, Maine. Stevens & Sayward, Printers to the State. Also pub. in Maine Farmer, March 23, 1865.

At p. 117:

"Three years ago, in the month of May, in company with a friend, while passing by the lower lock of the Cumberland and Oxford Canal, in the city of Portland, our attention was drawn to the a crowd of men standing by the side of the lock, several of whom had long-handled nets, with which they were fishing, or rather dipping out fish from the water. On coming up, we saw that they were catching alewives in great numbers. It appeared that these fish, in their peregrinations along the coast, had been attracted by the fresh water of the canal, and instinctively entered it in order, as they supposed, to follow up to its source, (Sebago Lake,) but were brought to a standstill by the upper gate of the lock. The men engaged there then shut the lower gate, and commenced catching them. As soon as those of them that were confined in the lock were all caught, the men opened the lower gate again, and admitted a lot more of them, and thus a wholesale destruction of them went on. I supposed that some of them might possibly work their way up, when the several locks should be opened for the passage of boats, and thus Sebago made a breeding place for them, but on inquiry, am told that there are few or none seen there. Now it would be a very easy matter to stock that lake with young herrings (alewives) by proprietors of the canal forbidding any of them to be caught on certain days, and placing men along the route to let them go through the gates into the lake. Indeed, it seems that by renting the privilege of fishing for them on certain days, some considerable revenue might accrue to the company, while the production of the fish would again become a benefit to the section of country through with the canal passes. The same system might be adopted on many streams by having fish-ways or fish-locks, to aid their ascent, with much benefit to the country and no detriment to the mill interests."

_______

Citation: Twelfth Annual Report of the Maine Board of Agriculture, 1867. Stevens & Sayward, Printers to the State.

At page 90: "In Monmouth they [smelt] run into some very small rills that lead into Cochnewagon Pond, and are dipped out in considerable quantities. In May, 1867, after it was supposed they were all gone, a fresh run occurred, that yielded thirty barrels."

How Maine's Sea-Run Fish were Dammed into Oblivion: 1864.

Citation: Boardman, Samuel L. 'Aquaeculture': in Ninth Annual Report of the Secretary of the Maine Board of Agriculture. 1864. Augusta, Maine. Stevens & Sayward, Printers to the State. Also pub. in Maine Farmer, March 23, 1865.

At p. 109-110:

"Everyone now knows that salmon, shad and alewives, and indeed all the other kinds of migratory fishes -- those that spend winters in the salt water, and come up out of the sea at certain periods, as if sent by a kind Providence, to spend the spring and summer in fresh water -- are now very scarce indeed, and in some streams totally extinct. Everyone knows, too, that many of the species of fishes which remain permanently in our fresh waters, have very much decreased in numbers, as well as in size and fatness. People say that this is a necessary consequence of the building of dams and mills, and filling the streams with obstructions of various kinds for the industrial pursuits of a civilized community. No doubt it is a consequence of these obstructions, but it not need be a necessary consequence. I hold that dams and mills might be constructed, and continued, and yet by a little concession on the part of dam and mill proprietors, and a more general diffusion of the knowledge of the natural history fishes, more intimate acquaintance with their peculiar habits, instincts, and wants of life, the mills might remain and the fish continue to perform their annual pilgrimage to and from their breeding haunts, if not in so great numbers as in former times, yet in such numbers as to afford a vast amount of provisions and even luxury to the communities which are now wholly deprived of them.

"I am also aware that this subject has been discussed over and over again -- that for years and years past, every session of our Legislature was thronged, and committees were worried and teased by mill owners on the one hand and fishermen on the other -- one demanding the privilege of building dams and mills without let or hindrance as to the fish, and the other pleading for some reserve, some fish-way, or some accommodation to the annual flow of the fish, which had been of such signal service to the support of the people on the banks and vicinity of the waters in question. I am also aware that our Legislators, actuated by a sincere desire to do justice to all parties, and to give equal rights to all, have, in most instance, made provisions in the several charters and private acts pertaining to mill owners, for the passage of fish at certain times and seasons, with a hope that, while it encouraged the establishment of mills and machinery, there would be also at the required times a safe and successful transit for the various species of fishes that required such passes as one of the indispensable requirements for the continuation of their existence. And we are all aware also that, either from ignorance of what habits of the fish demand, these ways have not always been properly constructed, or from selfishness in mill owners in not keeping them open at suitable times, these provisions in most cases failed, and the destruction of the fish is the inevitable result."

Saturday, November 27, 2010

FOSL letter to FERC 11-26-10

This letter informs FERC that the DEP has been irresponsible in its participation in the relicensing of Eel Weir dam, FERC project number 2984. This letter places on the official licensing record the impacts of the present post 1997 lake regulation on Sebago Lake, the Presumpscot River, Casco Bay, and the Gulf of Maine, global warming, and ocean acidification.

November 25, 2010
Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission (FERC)
Mail Code: OEP, PJ 12.3
888 First Street, N.E.,
Washington, DC 20426

Re: Project No. 2984-080-Maine, Eel Weir Dam , S.D. Warren Company(SAPPI)
Friends of Sebago Lake (FOSL) request:
1. A return to the historic 1910-1986 uniform outflow policy.
2. Additional relicensing studies request including the impact of abnormal
outflows for sustained time periods affecting lake wetlands and silica
depletion in the Sebago Lake water continuum.

Dear Secretary Bose,

It is time for the FERC and the licensee, S.D. Warren Co., to restore the outflow policy provided below for Eel Weir Dam which will re-establish ecologically beneficial conditions for Sebago Lake, the Presumpscot River , the Presumpscot River Estuary, and Casco Bay.

1. Return to historic pre 1982 uniform outflow range flows and lake levels.
2. Outflows would only be adjusted for lake levels entering the 25th and 75th percentile and again at the 10th and 90th percentile. This would allow low, average or high water levels in any season as precipitation dictates, yet prevent extreme low outflows or damaging violations of the flowage easements.
3 Average flows must be adjusted upward if changing climatic conditions i.e. climate change, continues to cause increased annual rainfall averages.
4 End any “yo-yo” river level flow operation due to eel or fish passage.
5. When water levels reach the historic 1910-1986, 10th, 25th, 75th and 90th weekly percentiles, flow changes must be adjusted instantaneously.



page one



If the present FERC approved 1997 Lake Level Management Plan (LLMP) was replaced with the outflow policy outlined on page one, the following beneficial impacts would occur:

1. End the continuing multi million dollar losses from wasteful hydropower
spillage that has occurred over the past 14 years due to the present LLMP .

2. Increase flood prevention storage capacity and mitigate excessive spillage.

3. Decrease occurrences of above full pond episodes and destructive flowage
easements violations.

4. Reverse increasing trophic state trend and improve water quality.

5. Maintain adequate dry space of septic systems in low lying areas in the summer
and end the phosphorus contributions from presently flooded septic systems .

6. Restore healthy biodiversity and nutrient filtering
functions of lake wetlands.

7. Control and eradicate invasive species like milfoil naturally.

8. Restore Maine’s most outstanding inland beaches.

9. Reduce harmful silica retention in inland freshwaters and subsequent silica
depletion in Casco Bay.

10. Restore healthy saltwater diatom populations allowing suppression of harmful
algae blooms.

11. Reduce monetary losses of the shellfishery industry due to increased “red tide”
closures of shellfish beds.

12.High flow events and lake levels below the pre 1982 historic 25th percentile
would scrub the river bottom and restore the Songo River to natural clear
sandy bottom habitat suitable for salmon and trout propagation. A return to
clear, open, and non- milfoil choked stream habitat would deter the recently
introduced pike.

page two
13.End the erosion of millions of cubic feet of riparian glacial till, clays, beach deposits and topsoils due to increased water level averages and constant high lake levels that has occurred since the 1997 LLMP went into effect.


It is baffling that an unprecedented delaying hold for a FERC hydro relicensing {project number 2984-042} has occurred since 2005. The reason for this 5 year delay is a Maine Department of Environmental Protection (MeDEP) study to determine how much lower allowable Presumpscot River flows can be reduced in the summertime without dissolved oxygen levels failing to meet minimum Class C
standards. The MeDEP justifies their flow study because SAPPI’s S.D. Warren mill is no longer discharging pulp effluent into the Presumpscot River and Smelt Hill Dam at the Presumpscot River outlet has been removed. Now, DEP claims less outflow is needed to dilute the pollution and sustain minimum dissolved oxygen concentrations. The further reduction in Sebago Lake minimum outflows sought by MeDEP, at the bequest of high water interests would, during droughts, guarantee adherence to minimum lake level targets of the 1997 FERC ordered LLMP.

This MeDEP Presumpscot River flow study has set a precedent that an impact of outflow discharge volume on water quality (dissolved oxygen) downstream of Sebago Lake is part of the relicensing process and the purpose of the information gathered during the study is to modify the LLMP. During the 1,750 plus days since the FERC final p-2984 license document was readied for final State Water Quality Certification (WQC) new evidences are surfacing that indicate the impacts of the present FERC Sebago Lake LLMP are significantly more broad and harmful to the entire Sebago Lake water continuum than we ever could have imagined.

The MDEP has ignored the harmful impacts of a double digit fold increase in river low flow events from 1997-2009 as compared with the period from 1910-1986 (23. Kasprzak). A comparable freshwater flow change on any northeast U.S. river would have “profound” impacts on the river estuary (22. Nixon et al). In addition “a twenty-six fold increase in high flow events” during the same time period is disrupting the natural abilities of Casco Bay’s estuarine systems to process nutrients and pollutants (25. Kasprzak). FOSL requests that impacts of the present unnatural regulation regarding silica depletion (DSi) in the Sebago Lake water continuum (Presumpscot River Estuary-Casco Bay) and the significant physical impacts of river-estuarine flow changes be studied and analyzed.
page three
FERC recommended in the 2005 Environmental Assessment for p-2984 that Sebago Lake wetlands be studied on a 5 year cycle. The last lake wetland
monitoring studies occurred in 2002. My request for new wetland plant studies,
biogeochemical assessment of wetland soils, and determination of dissolved silica concentrations and ratios with the other elements of nitrogen, phosphorus and iron is consistent with FERC’s 2005 Final Environmental Assessment p-2984
recommendation. FERC’s recommendation:

“Therefore, we recommend that S.D. Warren monitor wetlands around
Sebago Lake consistent with the program required for the 1997 LLMP, but
on a 5-year cycle. This monitoring program would afford S.D. Warren
the opportunity to document any long-term changes in wetland
cover and plant diversity. “(13. p.91 Federal Energy Regulatory
Commission Final Environmental Assessment
FERC Project 2984 Eel Weir Dam)

In depth wetland studies should commence as soon as possible because no Sebago Lake study exists that provides information on lake wetland vegetation changes since 1997 Lake Regulation Plan was implemented (21. Wilcox "Site Visit and Evaluation of Wetland Conditions at Sebago Lake"). Wetland vegetation is a key determinant of biogenic silica recycling.

The current unnatural freshwater flows of The Federal Energy Regulatory Commission’s current Sebago Lake LLMP, FERC hydro project number p-2984-Eel Weir Dam, create the chemical, physical and biological conditions that reduce the flow of sufficient dissolved silica. The increased depletion of dissolved silica is resulting in degradation of Sebago Lake, the Presumpscot River, the Presumpscot River estuary, Casco Bay and is harming fisheries in the Gulf of
Maine.

Below is a list of some impacts of the present unnatural regulation of Sebago Lake that contribute to dissolved silica depletion factors in Sebago Lake, the Presumpscot River and Casco Bay.

The reduced summertime outflow volume necessary to maintain near full pond lake levels result in a longer flow retention time of Sebago Lake and the Presumpscot River waters. This additional seasonal water residence time of lake and river waters allows for increased freshwater diatom population growth and
silica deposition (3. Ragueneau et al). Higher freshwater diatoms numbers
page four
contribute to additional depletion of the available lake and river reservoir of
dissolved silica (15. Stoermer ). The present lake regulation compounds the
existing impacts of other dams in the Presumpscot River for dissolved silica
retention and depletion. This impact is a commonly known part of the “artificial
lake effect’(4. Wang).
Reduced lake level fluctuation and constant high summer water levels increase anoxia in lake wetlands and lake sediments. This is now the case for Sebago Lake’s wetlands because now significant tracts of the lake wetland bottom sediments are never exposed to the air especially in the warm months. This lack of oxygen prevents dissolution of biogenic silica found in dead diatom shells and
some plant matter buried in the sediments. This recycling of biogenic silica is
lost to the water continuum because the diatom shells and dead plant matter
silicate is permanently sequestered in the wetland bottom sediments. Biogenic
silica is readily recycled under oxygenated conditions (16.Allanson, 6. Struyf).
The constant higher summer lake levels with reduced fluctuation reduces groundwater charge inflow to the lake. Groundwater is significantly higher in dissolved silica than surface water. The reduced summer groundwater charge lowers the available dissolved silica in the summer time 10. Hurley et al). Less lake level fluctuation as is presently the case leads to less contact of surface waters with soils and groundwater in the riparian zone and thus reducing weathering fluxes (19. Humborg et al). It is obvious that dissolved silica influx would be reduced. In addition, the constant high summer lake levels increase phosphorus contribution from septic systems in low lying beach areas thus further increasing diatom growth and uptake of dissolved silica ( 24. C-E Groundwater Study).
The present increases in low flow events affects the rheotaxis of anadromous fish. The anadromous fish species and the fish that pursue them for food up the estuaries stir the sediments. This piscatory stirring of estuary and river sediments thus helps to supply silica and other vital nutrients to coastal waters(1.Yahel et al).
Elevated phosphorus levels in the lake water column increase the uptake of dissolved silica by freshwater diatoms. The unnatural regulation increases phosphorus concentration to the lake due to shoreline erosion and diminished functions of wetlands to safely store nutrients. The lake’s natural buffering mechanisms that safely process nutrients are compromised. Lake wetlands of Sebago Lake are inundated through the summer months. Lake bottom sediments with increased layers of organic deposition have reduced exposure to the air. As a result the sediments become anoxic. Under the anoxic conditions phosphorus is released from the soils instead of being safely and permanently sequestered in
page five
the sediments.(9.Salki). Freshwater diatom populations will increase until
dissolved silica is depleted. When this happens non-silica algae dominate(12.
Struyf). Often, this is why algae blooms occur in late summer when summer
diatom growth tends to reduce silica concentrations.
Unnatural lake regulation changes the population of aquatic plant species(18. Changes in the Emergent Plant Cover Netly-Libau Marsh). Cattails and variable leaf milfoil thrive under the present unnatural lake regulation while native
species do not. Newspaper articles describe “enormous recent growths of milfoil
in the lower Songo River (20. Portland Press Herald July 15, 2010). Also,
monocultures of cattails will eliminate other plant species important for
maintaining high water quality (17. DCR Massachusetts). Explosive growth of
variable leaf milfoil in Sebago Lake’s coves and tributary river outlets has
harmed the historic ecosystem habitat. These invasive plants reduce oxygenation
of bottom sediments which increase phosphorus releases which further fuel
freshwater diatom growth. This compounds the harmful impact of
creating anoxic sediments and waters by creating geochemical changes in the
sediments which affects the dissolution and recycling
of biogenic silica.


The Disruption of the Silica Cycle by Unnatural Freshwater Flow(abnormal dam outflow discharges)

Freshwater diatom populations increase due to various impacts of unnatural lake regulation. Lake wetlands that never dry out or gain exposure to the air during the growing season have become anoxic. This results in the transport of phosphorus from bottom sediments which increases diatom population growth. These freshwater diatoms absorb available dissolved silica and biogenic silica to form their frustules (shells). Freshwater diatom frustules are larger than saltwater
diatoms and generally require larger volumes of dissolved silica than saltwater
diatoms. When diatoms die they sink to the bottom sediments. Now that lake and lake wetland sediments are more anoxic because of constant water inundation due to the present unnatural lake regulation, the biogenic silica both from plant matter and diatoms is not readily recycled as would occur under naturally fluctuating water levels and subsequent oxygenated conditions. In addition, the increased retention time of lake waters because of reduced outflows in the warm months of the year gives more opportunity for silica to be buried in sediments and
permanently removed from the silica cycle. When less dissolved silica reaches
page six
coastal waters, saltwater diatom populations can not maintain sufficient numbers. Healthy saltwater diatom populations suppress harmful algae blooms like red tide. Diatoms are the gold of the food chain and responsible for the historic superior
fishery of the Gulf of Maine. Watersheds with ten percent or greater lake area are already subject to natural silica depletion. Dams further the reduction of dissolved silica in the water continuum (18. Conley et al). Because of these existing factors, coastal waters are sensitive to the additional limitations of dissolved silica by the present flow regulation. Diatoms are regulators of ocean acidity and atmospheric carbon dioxide. Unnatural freshwater flows on a global scale may be one of the
larger contributors to climate change, to the demise of the ocean fishery, and to increased ocean acidity. Unnatural freshwater flow is a growing world wide problem but is essentially unnecessary in Maine.

Request for Additional Studies

Friends of Sebago Lake requests that FERC require additional studies for the
presently delayed relicensing of Eel Weir dam, FERC Project number 2984 to determine the impacts of the present lake regulation on silica depletion of Sebago Lake, the Presumpscot River, the Presumpscot River Estuary and Casco Bay.
The following impact studies of the present Sebago Lake LLMP regarding silica depletion should include:
Aeration and redox changes in wetland bottom sediment geochemistry affecting biogenic recycling of silica from wetland sediments (2.Struyf)
Lake wetland aquatic plant species population changes and resulting impacts on
diatom growth.Lake groundwater contributions of dissolved silica comparisons
with post 1997 lake management and pre-1986 management.
Identifying post 1986 flow regulation induced sources of increased phosphorus contribution to lake waters and subsequent effects on diatom populations and DSi.
4.Estimation of additional growth of diatom populations from longer summer
water flow retention time.
5.Determining seasonal dissolved silica concentrations in various areas of Sebago
lake waters .
Effect of increased low flows on rheotaxis of anadromous fish and subsequent
loss of stirring of silica rich estuary and river sediments. Reductions of
freshwater flow are generally associated with an overall negative impact on the
fishery.
7. Relationships of changes in lake regulation and increased occurrences of
page seven

numbers and intensities of red tide events in Casco Bay. Red tide events have
increased in numbers and intensity since the 1970’s. In the 1970’s the Maine
Legislature passed legislation promoting lake regulation that maintains high
lake levels with reduced annual fluctuations.
Relationship of silica depletion in the Presumpscot River- Sebago Lake water
continuum and the quality of the fishery in Casco Bay. Present unnatural flow
regulation is increasing lake temperature due to longer retention time of warm
summer upper epilimnetic water, reduced “colder” groundwater flow in the
summer and fall and subsequent increased “warmer” groundwater flow in late
fall and early winter. No doubt exists that earlier ice- outs, non iced-over winters
and warmer summer lake waters are a result of climate change. However, the
1997 lake level regulation plan is adding to increased lake temperatures and
accentuates the impact of climate change. The question arises is how much does
the lake regulation increase lake temperatures in addition to climate change and
what is the impact on freshwater diatom growth and dissolved silica uptake.

Because the MeDEP has steadfastly placed the relicensing of Eel Weir dam on hold for the last eight years and ignored evidence of growing profound degradation in the Sebago Lake continuum, we officially request of the FERC to additionally require investigation and study of the gravity of the environmental impacts of Sebago Lake’s unnatural freshwater outflows on Casco Bay, the Gulf of Maine, and the economies that depend on their health. It is critically important for ecological and economic considerations that scientifically appropriate lake, lake wetland and silica depletion studies as described in this letter be required before the final issuance of the Eel Weir Dam p-2984 license as proposed in the Final 2005 Environmental Assessment. If the LLMP was returned to the proposed historic uniform outflow policy outlined on page one, these additional studies would not be necessary.
Thank you.

Sincerely,
Roger Wheeler

Roger Wheeler, President of Friends of Sebago Lake
PO box 385
Fryeburg, Maine 04037

page eight

cc: Nancy Skancke (SAPPI)
Dana Murch MeDEP)
Steve Kasprzak (FOSL)
Douglas Watts (FOSL)
Paul Lepage (State of Maine)
Beth Nagusky (MeDEP)
Ted Tibbals (FOSL)
Olympia Snowe
Susan Collins
Brad Goulet (SAPPI)





























page nine
Bibliography
1. Fish activity: a major mechanism for sediment resuspension and organic matter remineralization in coastal marine sediments, Gitai Yahel1,6,*,**, Ruthy Yahel1,2,**, Timor Katz3,4,**, Boaz Lazar3, Barak Herut4, Verena Tunnicliffe1,2,51Department of Biology, University of Victoria, PO Box 3020, Victoria, British Columbia V8W 3N5, Canada -2VENUS, University of Victoria, PO Box 1700, Victoria, British Columbia V8W 2Y2, Canada 3The Institute of Earth Sciences, The Hebrew University, Givat Ram, Jerusalem 91904, Israel -4Israel Oceanographic and Limnological Research, Haifa 31080, Israel -5School of Earth & Ocean Sciences, University of Victoria, PO Box 3055, Victoria, British Columbia V8W 3P6, Canada -6Present address: School of Marine and Environmental Science, Michmoret 40297, Israel
Silica: an essential nutrient in wetland biogeochemistry,Eric Struyf and Daniel J Conley -GeoBiosphere Science Centre, Department of Geology, Lund University, Lund, Sweden-Department of Biology, Ecosystem Management Research Group, University of Antwerp, Antwerpen, Belgium
Responses of Coastal Ecosystems to Anthropogenic Perturbations of Silicon Cycling, Olivier Ragueneau, Daniel J. Conley,Aude Leynaert, Sorcha Ni Longphuirt, and Caroline P. Slomp
A Promising style of growth velocity model of green algae and diatoms in local lake area ,Zhihong Wang, Fuyi Cui, Wenxuan Chen and Jie Jia , Chinese Journal of Geochemistry Volume 25, Supplement 1,
Freshwater marshes as dissolved silica recyclers in an estuarine environment (Schelde estuary, Belgium) Eric Struyf 1 Contact Information, Stefan Van Damme1, Britta Gribsholt and Patrick Meire (1)Department of Biology, Environmental Management Research Group, University of Antwerp, Universiteitsplein 1C, B-2610, Wilrijk, Belgium
KNAW), Korringaweg 7, 4401 NT Yerseke, The Netherlands Journal Hydrobiologia Issue Volume 540, Numbers 1-3 / May, 2005
page ten

7.Silica fluxes and trapping in two contrasting natural impoundments of the upper
Mississippi River, by: L. Triplett, D. Engstrom, D. Conley, S. Schellhaass
Biogeochemistry, Vol. 87, No. 3. (26 March 2008), pp. 217-230.

8.Biogenic silica in freshwater marsh sediments and vegetation (Schelde estuary,
Belgium) E Struyf, S Van Damme, B Gribsholt, JJ … - 2005 – vliz.be

9.The world's 10th largest lake under threat: Lake Winnipeg, the
economic mainstay of Manitoba, Canada.
Author: Mr. Alex Salki, Freshwater Institute Fisheries and Oceans, Canada

10.Ground Water as a Silica Source for Diatom Production in a Precipitation-
Dominated Lake
JAMES P. HURLEY 1, DAVID E. ARMSTRONG 1, GALEN J. KENOYER 2, and CARL J.
BOWSER Water Chemistry Program, University of Wisconsin, Madison 53706
Department of Geology and Geophysics, University of Wisconsin

11.VARIATION OF SILICA AND DIATOMS IN A STREAM
WUN-CHENG WANG ,RALPH L. EVANS
Water Quality Section, Illinois State Water Survey,

12.The Global Biogeochemical Silicon Cycle Eric Struyf & Adriaan Smis & Stefan Van Damme &
Patrick Meire & Daniel J. Conley

13. Federal Energy Regulatory Commission Final Environmental Assessment
FERC Project 2984 Eel Weir Dam, p.91
“S.D. Warren proposes to replace the existing wetlands
monitoring program with a similar monitoring program, having a 5-
year monitoring cycle. Our analysis in section V.C.4
(Terrestrial Resources) shows that, in the 5 years after
implementation of the 1997 LLMP, wetlands have changed little.
In addition, we do not expect our recommended changes to the LLMP
to have any significant effects on wetlands. Thus, continuing to
monitor wetlands annually is unnecessary. Therefore, we
recommend that S.D. Warren monitor wetlands around Sebago Lake
consistent with the program required for the 1997 LLMP, but on a
5-year cycle. This monitoring program would afford S.D. Warren
the opportunity to document any long-term changes in wetland cover and plant
diversity”.
page eleven


14.The Role of Freshwater Inflows in Sustaining Estuarine Ecosystem Health in the San
Antonio Bay Region, www.harc.edu Contract Number 05-018 September 15, 2006
page eight
15.Stoermer, E.F. and J.P. Smol, The Diatoms: Applications for the Environmental and Earth
Sciences, page 159 June 1999, Cambridge University Press

16. Some factors governing the water quality of microtidal estuaries in South Africa,
BR Allanson
Institute for Water Research, Rhodes University, Grahamstown 6140, South Africa

17. www.mass.gov/dcr/watersupply/lakepond/factsheet/Variable%20Milfoil.pdf
Changes in the Emergent Plant Cover Netley-Libau Marsh Between 1979 and
2001 Delta Marsh Field Station(University of Manitoba) Occasional
Publication No. 4 , November 2004

18. The Transport and Retention of Dissolved Silicate by Rivers in Sweden
and Finland, by Daniel J. Conley, Per Stalnacke, Heikki Pitkanen and
Anders Wilander © 2000 American Society of Limnology and
Oceanography.

C. Humborg, M. Aigars,M.RTH and V. Ittekkot, Decreased silica lad-
sea fluxes through damming in the Baltic Sea catchement-
significance of particle trapping andhydrological alterations August
2005

20. “Weeding out Trouble”, Portland Press Herald July 15, 2010

21. Dr. Douglas Wilcox,"Site Visit and Evaluation of Wetland Conditions at
Sebago Lake." 2008

22. Scott Nixon, Stephen B. Olsen, Elizabeth Buckley, Robinson Fulweiler,
Managing Freshwater inflows to estuaries Lost to the Tide: The Importance of
Freshwater Flow to Estuaries 2004 Final Report submitted to the Coastal
Resources Center, Narragansett, RI: University of Rhode Island, Graduate
School of OceanographyFi

Steve Kasprzak letter to Susan Collins June 9, 2010 Friendsofsebago.blogspot.com

Sebago Lake Groundwater Study, C-E Environmental, Inc. prepared for Portland Water District, September 1991
page twelve

Steve Kasprzak letter to Beth Nagusky, Acting Commissioner of MeDEP,
Nov. 4,2010



10



























page thirteen





page